Tech Tutorials Database
GeekArticles Testing Test Director

Integrating CaliberRM with TestDirector

Category: Test Director
Comments (0)

CaliberRM allows requirements to trace to the following TestDirector objects: Test sets that are groups of tests within TestDirector. CaliberRM shows the results of the last execution of a test set on the Traceability tab. Tests that are in Folders. You can show traces while Tests are still in design and not ready to be placed in a Test Set. Tests that can only be executed as a member of a test set. CaliberRM displays the results of the last execution of the test from within any of the test sets for which it is a member. Test Steps that are defined within a test. When a CaliberRM requirement traces to a test step, the status is that of the last execution of the step.


Sponsored Links




Post Your Comment:

Your Name:*
e-mail ID:(required for notification)*
Image Verification:�

Subscribe via RSS

Subscribe to by Email

Enter your email address:

 Subscribe in a reader


Test Director


Sponsored Links